Cost required to start a new poultry building.
SIZE ( 20 feet length by 70 Feets Breathe)
Start Date : Mid September - Till Present .
Wood 2 by 4 : 35 pieces x 300 = 10500
Wood 2 by 3 : 130 Pieces Palmwood x 200 = 26000
Planks 30 pieces x 1250 = 37500
Roof Nail : 3 Packs x 1100 = 3300
Long Nail : 1 Bag x 6000 = 6000
Zinc : 10 bundles x 9500 = 95000
Zinc Mid Cover : 4 pieces x 1500 = 6000
Building Blocks : 1200 x 120 = (4 coaches : 144,000
Cement : 35 x 1300= 45500
Sand = 19000 x 2 = 38000
Stone: 9000
Nets : 2 bundles x 5000 = 10,000
Plywood : 8000
Plywood Nail : 2000
Cost of Labor ( Carpentary) 40000
Cost of Labor Bricks Layers and Labor : 75000
Transportation of building materials and planks = 10000
Generator : 60000
Borehole : 200,000
Tank: 32000(2500 liters )
Bond of roll hose pipe : 6000
Bundle of wire : 6,500(1.5mm)
Junction box pack : 1000
Change over switch : 800
Lamp holders : 1200
Padlock : 2000
Bulb :1000
Omo onile Charges : 50k but promptly bargained to 35k
NB
Drop cups, canopy/ Nylon cover , building blocks used for fencing and cement plus labor fees not included ... Wiring works and demarcation was done by me. And continuous work will be done as well as updating this trend when we start production ASAP . I hope this will help naira landers prepare. .. God help us all.
SIZE ( 20 feet length by 70 Feets Breathe)
Start Date : Mid September - Till Present .
Wood 2 by 4 : 35 pieces x 300 = 10500
Wood 2 by 3 : 130 Pieces Palmwood x 200 = 26000
Planks 30 pieces x 1250 = 37500
Roof Nail : 3 Packs x 1100 = 3300
Long Nail : 1 Bag x 6000 = 6000
Zinc : 10 bundles x 9500 = 95000
Zinc Mid Cover : 4 pieces x 1500 = 6000
Building Blocks : 1200 x 120 = (4 coaches : 144,000
Cement : 35 x 1300= 45500
Sand = 19000 x 2 = 38000
Stone: 9000
Nets : 2 bundles x 5000 = 10,000
Plywood : 8000
Plywood Nail : 2000
Cost of Labor ( Carpentary) 40000
Cost of Labor Bricks Layers and Labor : 75000
Transportation of building materials and planks = 10000
Generator : 60000
Borehole : 200,000
Tank: 32000(2500 liters )
Bond of roll hose pipe : 6000
Bundle of wire : 6,500(1.5mm)
Junction box pack : 1000
Change over switch : 800
Lamp holders : 1200
Padlock : 2000
Bulb :1000
Omo onile Charges : 50k but promptly bargained to 35k
NB
Drop cups, canopy/ Nylon cover , building blocks used for fencing and cement plus labor fees not included ... Wiring works and demarcation was done by me. And continuous work will be done as well as updating this trend when we start production ASAP . I hope this will help naira landers prepare. .. God help us all.